Risk Management Program (RMP) Support
ConsultingCompanies that handle certain highly hazardous chemicals in excess of threshold quantities must comply with EPA’s Risk Management Program (RMP) rule, 40 CFR Part 68. EPA’s RMP rule embraces OSHA’s PSM standard but applies it to protection of the public and the environment rather than employees as is the case with OSHA. However, the RMP rule goes beyond PSM in its requirements.
For example, it requires the determination of impact distances for a worst-case accident and at least one alternative release scenario. These additional aspects of the RMP regulation require technical expertise beyond that required for PSM. As with PSM, the RMP regulation is performance-based and compliance with it is quite different from specification-based regulations that spell out requirements. Decisions must be made by companies on how to meet the regulatory requirements and what levels of performance are appropriate. As technical improvements are made, EPA’s expectations for performance increase. Companies must stay abreast of these developments and adjust their programs accordingly. For these reasons, many companies find it is more cost effective to seek outside expertise in developing and maintaining their RMPs.
Details
Services Offered
- Development of Risk Management Programs.
- Full Risk Management Program development can include all levels of implementation assistance.
- Preparation of updates to Risk Management Plans.
Other Information
The Management System requires the assignment of responsibilities for the overall program and individual program elements and the definition of lines of authority. The Hazard Assessment involves an Offsite Consequence Analysis (OCA) and the compilation of a five-year accident history for the process. The OCA considers worst-case and alternative release scenarios so that impacts on the population and the environment can be determined.
The Prevention Program is EPA’s equivalent of OSHA’s PSM Program and the Emergency Response Plan is similar to the Emergency Planning and Response element of OSHA’s PSM standard. The Risk Management Plan is used to notify EPA that a facility is covered under the regulations and provides summary information about the RMP. It must be certified by signature of a company representative.
Consulting Services
Consequence Modeling
Due Diligence Support Dust Hazard Analysis and Management
Dust Hazard Analysis and Management
Emergency Response Programs
Expert Technical Witness - Legal Support Services
Facility Siting & Consequence Modeling
HAZID
Hierarchy of Controls Analysis (HCA)
Human Factors Review and Analysis
Incident Investigation
Inherently Safer Technology
Layers of Protection Analysis
LNG Industry Support
Management of Change (MOC) - Process and Organizational Change Assessment
Mechanical Integrity
NEP Compliance Support all Industries
Procedure Development and Enhancement
Process Hazard Analysis (PHA)
Probability Modeling
Project Support and Process Integration
PSM / RM Program Enhancement and Optimization
PSM / RMP Auditing
PSM Program Development
Quantitative Risk Assessment
Risk Management Program (RMP) Support
Safeguards Protection Analysis (SPA)
Safety Instrumented Systems (SIS)
Safety Management Systems
Simultaneous Operations (SIMOPS) Review